US 97 (HWY 042) over SPANISH HOLLOW CREEK

US 97 (HWY 042) over SPANISH HOLLOW CREEK

US 97 (HWY 042) over SPANISH HOLLOW CREEK,
61 Miles South of Biggs Jct. Oregon

Related Content

  • Contractor: Stellar J Corp.
  • Ready Mix Supplier : Hood River S&G
  • ODOT : Structural HPC Internally Cured 4000 PSI, w/c ratio .38 >2000 Coulombs, Shrinkage 0.035 max
  • Plastic Density = 141 pcf, 5% air, 5 ½” Slump
  • Avg. Comp. Strength 6230 @ 28 day
  • Shrinkage (ASTM C157) = 0.031% 2 28 days
  • RCPT (AASHTO T277/ASTM C1202) 778 Coulombs @ 90 days
  • 449 lbs. Lafarge Cement
  • 204 lbs. Centrailia Fly Ash
  • 27 lbs. BASF Masterlife Silica Fume
  • 670 lbs. Cementitous (7 bag mix)